Filter

×
Active Filters Clear All
Keyword: Rubin GPU ×
27 Total Reports
2/2 Page
NVIDIA Other 2026-06-12

NVIDIA and SK Hynix Lock Down HBM4/5 Roadmap, Cementing Vera Rubin Supply Chain

NVIDIA and SK Hynix sign a multi-year agreement to co-define HBM4 production and HBM5 pre-research for Vera Rubin GPUs. Samsung also enters HBM4 supply as a second source. The deal elevates SK Hynix from vendor to co-developer, potentially creating a de facto memory standard barrier that marginalizes Micron and others.

AMD Other 2026-06-12

AMD Zen 6 Venice 256-Core EPYC Claims 3.3x Rack Performance Over NVIDIA Vera, But Estimates Raise Questions

AMD unveils first estimated performance of Zen 6 Venice EPYC (2nm, 256 cores), claiming 3.3x rack-level integer throughput over NVIDIA Vera at 100kW total power. A direct counter to NVIDIA's Arm push, but based on projected estimates, not silicon.

NVIDIA Other 2026-06-01

NVIDIA RTX Spark: SoC Seizes PC Control, AI Compute Revolution with Ecosystem Lock-in

NVIDIA launches RTX Spark SoC, integrating Blackwell GPU with 20-core Grace CPU (MediaTek co-designed), NVLink-C2C at 600GB/s, up to 128GB unified memory, 1 petaflop FP4 AI, and local 120B-parameter LLM support. This marks a shift from GPU vendor to platform provider, directly challenging Apple M, Qualcomm, and x86 incumbents.

NVIDIA Product Launch 2026-05-29

NVIDIA's Triple Play: Vera CPU, N1X Laptop Chip, and $6.5B Silicon Photonics Reshape AI Infra Control

NVIDIA delivers first agent-specific Vera CPU (88 Arm v9.2 cores, 1.2TB/s memory bandwidth), teases consumer N1X laptop chip, and invests $6.5B in silicon photonics. This shifts AI orchestration control from x86 to NVIDIA's Arm ecosystem, while CPO addresses memory wall, but volume production remains challenging until post-2028.

NVIDIA Technology Update High Signal 2026-05-02

Global GPU Shortage to Persist Until 2027: Core Bottleneck for AI Infrastructure Expansion

Global GPU shortage expected to extend to 2027-2028, rooted in AI data center demand surge, constrained HBM production, CoWoS packaging tightness, and geopolitical risks. NVIDIA Rubin's mass production hindered (target reduced from 2M to 1.5M units), with Blackwell capturing 71% of high-end GPU shipments in 2026. Consumer RTX 5080/5070 Ti priced $200-$500 above MSRP, enterprise AI infrastructure procurement cycles will further extend.

NVIDIA Product Launch High Signal 2026-04-27

NVIDIA Rubin Delayed, Blackwell to Account for 71% of High-End GPU Shipments in 2026

NVIDIA Rubin GPU production target lowered from 2M to 1.5M units due to HBM4 memory validation delays. TrendForce data shows Blackwell share rising from 61% to 71% in 2026, consolidating dominance. Micron exits Rubin HBM4 supply chain, SK hynix to hold 70% share. Analysts maintain overweight ratings, viewing impact as limited. Rubin delay may extend SK hynix's HBM3E market dominance.

NVIDIA Other High Signal 2026-04-22

NVIDIA and Google Cloud Deepen Collaboration to Build Cloud Infrastructure for AI Factories and Physical AI

NVIDIA and Google Cloud have announced an expanded collaboration, introducing new Vera Rubin and Blackwell GPU-powered instances to build "AI factories" scaling to nearly a million GPUs. The integration of Gemini, Nemotron, and other platforms aims to accelerate production deployment of agentic and physical AI, such as robotics and digital twins.