Filter

×
Active Filters Clear All
Keyword: 5GW ×
7 Total Reports
NVIDIA Other 2026-07-14

NVIDIA's HVDC Power Shift Reshapes AI Data Center Energy Efficiency and Supply Chain

NVIDIA is driving a shift from AC to HVDC power systems for AI data centers, aiming to reduce conversion losses and improve efficiency. This move will reshape the entire supply chain for servers, power equipment, and cooling, but faces challenges in safety and standardization. It signals a generational change in AI infrastructure power delivery.

Meta Other 2026-07-14

Meta Expands Hyperion to 5GW with $50B Investment, Pioneering Local-First AI Infrastructure

Meta expands its Louisiana Hyperion data center to 5GW capacity, raising total investment from $10B to $50B. Partnering with Entergy to build 10 power plants and 240 miles of transmission lines, and utilizing JV and financing structures, Meta pioneers a local-first model that reshapes the collaboration between AI infrastructure, energy, and capital.

Meta Other 2026-07-13

Meta Iris Chip to Mass Produce in September: 6-Month Cadence Threatens NVIDIA GPU Hegemony

Reuters confirms Meta's Iris AI chip mass production in September, targeting 2.5GW by end-2026 and 14GW by 2027. Meta's 6-month MTIA generation cadence directly challenges NVIDIA's annual GPU cycle, signaling a hyperscaler shift from GPU dependency to custom ASIC sovereignty.

Microsoft Other 2026-07-12

Microsoft Takes Over OpenAI's Arctic Data Center, Seizing AI Compute Control

Microsoft leases a data center in Norway's Arctic Circle from Nscale, deploying 30,000 NVIDIA Vera Rubin GPUs, filling the gap left by OpenAI's retreat. OpenAI slashes its 2030 infrastructure budget from $140B to $60B. Microsoft surpasses OpenAI in AI compute capacity and gains geographical redundancy.

Anthropic Other 2026-07-12

Anthropic Locks 3.5GW TPU Compute with Broadcom, Signaling Shift to Custom AI ASICs

Broadcom's Q2 FY2026 filing reveals a 3.5GW TPU compute deal with Anthropic starting 2027. This marks a strategic shift from general-purpose GPUs to custom ASICs for AI workloads, with OpenAI and Meta making similar multi-GW commitments, signaling a fundamental change in AI infrastructure.

Amazon Other 2026-06-30

AWS and Google Open Custom AI Chips for External Sales, ASIC Shipment Growth Surpasses GPU, TCO Inflection Point Reached

In Q2 2026, AWS Trainium and Google TPU are commercialized externally for the first time. Custom ASIC shipment growth of 44.6% surpasses GPU's 16.1%. ASIC TCO advantage reaches 40-65% for large-scale inference; Midjourney cut monthly compute cost from $2.1M to $0.7M after migrating to TPU. This marks a structural inflection point in AI compute.

Anthropic Other High Signal 2026-04-21

Anthropic Signs $100B+ Deal with AWS to Lock in Decade of AI Compute

Anthropic signed a new agreement with Amazon AWS, committing over $100 billion over the next decade to secure up to 5GW of AI compute capacity and deeply integrate the Claude Platform into AWS. This move aims to address explosive demand for its Claude models and solidify its position as a key AI model provider on AWS.